Pre-Feed/Feed SUBSEA INNOVATIONS
Typical Deliverables
- Subsea Installation Philosphy
- Component and System Option Comparisons
- Identify Long Lead Items
- Redundancy and Spares Philosophy
- Regulatory Analysis
- New Equipment and Technology Studies
- Request For Quotes (RFQ)
- Preliminary Subsea Basis of Design
- Preliminary Functional Design Requirements
- Low Pressure (LP), High Pressure (HP), Hydraulic Analyses
- Umbilical Requirements and Acquisition
- Concept Design Reviews
- Bid Evaluations
- Field Architecture Drawings
- Subsea Control System Functional Design Requirements
- Electrical, Optical, and Hydraulic Subsea Distribution Drawings
- Electrical, Optical, and Hydraulic Subsea Distribution Drawings
- Subsea Flying Lead Schedules
- Topside Cabling Diagrams
- Master Control Station (MCS) Functional Design
- UPS, VFD, Transformer Datasheets
- Engineering Integrity Management/ Design Safety
- Subsea System Integration Test (SIT) Plan
- System Process Flow Diagram (PFD)
- Piping and Instrumentation Diagrams (P&ID)
- Equipment General Arrangement Drawings
- Design Reviews
- Software Basis of Design
- I/O Lists
- Interlock Lists / Specification
- Emergency Shutdown (ESD) Specification
- Cause and Effects
- Subsea Equipment Vendor Oversight
- Subsea Layout Drawings
- Subsea Basis of Design
- Test Equipment Design / order
- Installation and Commissioning Procedures
- Test Procedures